TPHView

← Back to GCD Viewer
1. Setup2. Cal/Blwdn3. Integrate4. Quantify5. Report

Step 1 — Batch Setup

Enter batch metadata and instrument parameters. These populate the PDF report header.

Sample Parameters

⚠ Soil only — Moisture Correction (Fw/Iw)

Enter Iw and Fw to compute Fw/Iw

Leave Iw/Fw blank if moisture correction is not required (as-received basis).

GCD File Summary

ParameterValue
File291941_021.gcd
Version5.01
Injection Date2026-05-07 10:08:52.119237+00:00
VialVial 3
Injection Volume5.0 µL
Method FileC:\Data\GCMSsolution\Data\TRH\2026\May 2026\20260113 solid\TRH-Standards Exp Sept 2026 - Calibration C10-C36.gcm
Data Points39751

Calibration Peaks (from GCD)

CompoundRT (s)C1C2C3C4C5
C10-C14 as C14267.12.515.0110.0225.0550.10
C15-C28 as C26552.52.515.0110.0325.0850.15
C29-C36 as C32818.52.515.0110.0225.0550.10
C42976.52.414.839.6624.1448.29

TPH Groups (from GCD)

BandArea (µV·s)Height (µV)Conc (ppm)
C10-C14 as C14100,155.716,713.37.113
C15-C28 as C26499,772.0168,732.543.048
C29-C36 as C32104,165.413,426.89.973
C42112,189.667,109.312.009