TPHView

← Back to GCD Viewer
1. Setup2. Cal/Blwdn3. Integrate4. Quantify5. Report

Step 1 — Batch Setup

Enter batch metadata and instrument parameters. These populate the PDF report header.

Sample Parameters

⚠ Soil only — Moisture Correction (Fw/Iw)

Enter Iw and Fw to compute Fw/Iw

Leave Iw/Fw blank if moisture correction is not required (as-received basis).

GCD File Summary

ParameterValue
FileC10 s.113_014.gcd
Version5.01
Injection Date2026-05-07 06:11:21.291959+00:00
VialVial 3
Injection Volume5.0 µL
Method FileC:\Data\GCMSsolution\Data\TRH\2026\May 2026\20260113 solid\TRH-Standards Exp May 2026 - Calibration C10.gcm
Data Points39751

Calibration Peaks (from GCD)

CompoundRT (s)C1C2C3C4C5
C10178.12.515.0110.0225.0550.10

TPH Groups (from GCD)

BandArea (µV·s)Height (µV)Conc (ppm)
C10121,468.891,244.89.470