TPH Wizard

← Back to Batch
Step 1: Calibration
Step 2
Step 3
Step 4
Step 5

Step 1 — Calibration Setup

Review retention times from the .gcm method file and confirm the RT window for each calibration compound. The wizard will then integrate peaks from the Standard GCD files to build calibration curves.

Batch: 19052026 solid - Total Petroleum Hydrocarbon - TPH · 0 Standard file(s)

C10-C14 as C14 — RT 16.0236 min   Levels: 2.51, 5.01, 10.02, 25.05, 50.10 ppm

no data

C15-C28 as C26 — RT 33.1488 min   Levels: 2.51, 5.01, 10.03, 25.08, 50.15 ppm

no data

C29-C36 as C32 — RT 49.1112 min   Levels: 2.51, 5.01, 10.02, 25.05, 50.10 ppm

no data

C42 — RT 58.5919 min   Levels: 2.41, 4.83, 9.66, 24.14, 48.29 ppm

no data