Step 1 — Calibration Setup
Review retention times from the .gcm method file and confirm the RT window for each calibration compound. The wizard will then integrate peaks from the Standard GCD files to build calibration curves.
Batch: 20260113 solid - Total Petroleum Hydrocarbon - TPH · 0 Standard file(s)
C10-C14 as C14 — RT 16.0236 min Levels: 2.51, 5.01, 10.02, 25.05, 50.10 ppm
no data
C15-C28 as C26 — RT 33.1488 min Levels: 2.51, 5.01, 10.03, 25.08, 50.15 ppm
no data
C29-C36 as C32 — RT 49.1112 min Levels: 2.51, 5.01, 10.02, 25.05, 50.10 ppm
no data
C42 — RT 58.5919 min Levels: 2.41, 4.83, 9.66, 24.14, 48.29 ppm
no data